Construction Project
BMVg - Federal Ministry of Defence |
Location
|
Client
- Federal Republic of Germany, represented by the Federal Building Office Berlin I
|
Planning
- Burckhard, Emch & Berger, Berlin
|
volume
|
Construction period
- December 1997 to July 2001
|
Contracted services for BMG
- Section 15.6–8- HOAI–Allocation, property planning of buildings and outdoor installations, property supervision
- Section 73.8 HOAI–Property planning of technical installation, property supervision
|
Lot area
|
Footprint
|
Gross floor space
|
Gross volume
|
Storeys
- Base storey, 1st to 4th floors and attic storey as well as cellar story in Module E and two inner courtyards with glass roofs at the level of the 2nd storey
|
Utilization
- Office building of the Federal Ministry of Defence
|
Construction
- Listed old building, built 1911 to 1914
- New construction and extension by J. Ch. Bendler (1926 to 1938)
|
Design/Fixtures
- Masonry structure with steel-stone and in part vaulted ceilings, with later additions and conversions in steel framework construction
- Reconstruction of the two-storey ballroom and conference room
- Reconstruction of the three-storey main hall, designed as atrium, with stairways
- Triaxial projection with triangular gable, lobby and vestibule and open staircase with bullet-proof driveway for state receptions
- Installation of state-of-the-art communications, security and shielding technology
- Reconstruction of the greater part of the wooden box double windows
|