BMG GmbH & Co. KG - Keithstrasse 2-4 - D-10787 Berlin | Tel: +49 (0)30 2100220

PDB 44

Construction Project
BMW Car Factory Leipzig-Assembly works
Location
  • Industrial Park Leipzig-North
Client
  • BMW AG
Planning
  • ARGE overall planning with the participation of IFB Dr. Braschel AG and WPW Ingenieure, Leipzig
Investment volume
  • approx. EUR 85.0 million
Construction period
  • July 2002 to September 2003
Contracted services for BMG
  • Section 15.8–9 HOAI–Property planning for buildings
  • Section 57 HOAI–Local construction supervision
  • Construction site logistics
Lot area
  • 2,000,000 m2
Footprint
  • 110,000 m2
Gross floor space
  • 114,000 m2
Gross volume
  • 1,700,000 m3
Storeys
  • 2 storeys
Utilization
  • Final assembly of the new 3-Series BMW, including required repainting
Construction
  • Steel supports with grid connectors
  • Steel supports on single foundations, about 460, grid 18.00 x 25.00 m
Design/Fixtures
  • Outside façade insulated sheet metal
  • Flat roof
  • Conveyor belts with belt overhead construction
  • Changing room with wet cell
  • Filling station