PDB 48

Construction Project
BMW Car Factory, Gatehouse
Location
  • Industrial Park Leipzig-North
Client
  • BMW AG
Planning
  • ARGE overall planning with the participation of IFB Dr. Braschel AG and WPW Ingenieure, Leipzig
Investment volume
  • approx. EUR 4.0 million
Construction period
  • January 2003 to July 2003
Contracted services for BMG
  • Section 15.8-9 HOAI-Property planning for buildings
  • Section 57 HOAI-Local construction supervision
  • Construction site logistics
Lot area
  • 2,000,000 m²
Footprint
  • 1,650 m²
Gross floor space
  • 3,400 m²
Gross volume
  • 15,000 m³
Storeys
  • Basement, ground floor, 1st floor
Utilization
  • Plant security, fire brigade, network centre and office
Construction
  • Basement as concrete impervious to water in exposed concrete, reinforced concrete pre-fabricated construction with additional steel supports, ceiling construction with pre-stressed concrete hollow plates
Design/Fixtures
  • Non-bearing interior walls as solid lime malm brick exposed masonry, façade as insulated sheet steel panelled wall, thermal insulation glazing and sunshade on the outside